Close Menu
  • Home
  • Education
  • Health
  • National News
  • Politics
  • Relationship & Wellness
  • World News
What's Hot

No median cuts, surface intersections on future high-speed NH corridors: NHAI

September 21, 2026

In 2016, Michael Dell paid $10.9 million for a Boston penthouse; 10 years later the barely used 4,100-sq-ft home is going to auction with a $6.5 million reserve

September 21, 2026

Denver's historic bank building was bought for $17.6 million and got a $22.4 million renovation; after WeWork left, the 107,630-sq-ft property is now 100% vacant

September 21, 2026
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram YouTube
Global News Bulletin
SUBSCRIBE
  • Home
  • Education
  • Health
  • National News
  • Politics
  • Relationship & Wellness
  • World News
Global News Bulletin
Home»Business»No median cuts, surface intersections on future high-speed NH corridors: NHAI
Business

No median cuts, surface intersections on future high-speed NH corridors: NHAI

editorialBy editorialSeptember 21, 2026No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email Telegram Copy Link
No median cuts, surface intersections on future high-speed NH corridors: NHAI
Share
Facebook Twitter LinkedIn Pinterest Email Copy Link
No median cuts, surface intersections on future high-speed NH corridors: NHAI
A view of the Barapullah Phase-3 elevated corridor that is scheduled to be inaugurated on September 29, 2026, in New Delhi on Saturday. (ANI Photo)

NEW DELHI: New access-controlled high-speed national highway corridors will have no median (divider) openings and no at-grade (surface level) intersections, a move that aims at eliminating conflict points and reducing crashes.It has also been mandated under new NHAI guidelines issued on Monday that these corridors won’t have raised concrete dividers but flush medians — painted centre lanes with thick wire ropes or crash barriers. These will also have advance exit signage at 5 km, 2 km, 1 km and 500 metres to help motorists prepare for lane changes well in advance.The design provisions are aimed at improving safety on access-controlled corridors where cars are allowed to travel at speeds of up to 100 kmph. Delhi-Dehradun Expressway, Ambala-Kotputli corridor and Trans-Haryana corridor are among such highways.NHAI said the guidelines seek to bring uniformity in the planning and design of access-controlled high-speed corridors and ensure consistency in technical standards across projects.“The guidelines will apply to all upcoming four-lane and six-lane greenfield and brownfield access-controlled high-speed national highways,” an NHAI spokesperson said.Officials said eliminating median cuts and surface intersections will prevent dangerous cross movements and wrong-side driving, while standardised signage and geometric design will improve traffic flow and reduce the risk of high-speed crashes on the new generation of national highway corridors.

Share your thoughts in the comments

Economy News

No median cuts, surface intersections on future high-speed NH corridors: NHAI

By editorialSeptember 21, 2026

A view of the Barapullah Phase-3 elevated corridor that is scheduled to be inaugurated on…

In 2016, Michael Dell paid $10.9 million for a Boston penthouse; 10 years later the barely used 4,100-sq-ft home is going to auction with a $6.5 million reserve

September 21, 2026

Denver's historic bank building was bought for $17.6 million and got a $22.4 million renovation; after WeWork left, the 107,630-sq-ft property is now 100% vacant

September 21, 2026
Top Trending

No median cuts, surface intersections on future high-speed NH corridors: NHAI

By editorialSeptember 21, 2026

A view of the Barapullah Phase-3 elevated corridor that is scheduled to…

In 2016, Michael Dell paid $10.9 million for a Boston penthouse; 10 years later the barely used 4,100-sq-ft home is going to auction with a $6.5 million reserve

By editorialSeptember 21, 2026

Billionaire tech executive Michael Dell is putting his little-used Boston penthouse up…

Denver's historic bank building was bought for $17.6 million and got a $22.4 million renovation; after WeWork left, the 107,630-sq-ft property is now 100% vacant

By editorialSeptember 21, 2026

The building was originally constructed in 1907 and was later redesigned by…

Subscribe to News

Get the latest sports news from NewsSite about world, sports and politics.

Facebook X (Twitter) Instagram YouTube

News

  • Education
  • Health
  • National News
  • Relationship & Wellness
  • World News
  • Politics

Company

  • Information
  • Advertising
  • Classified Ads
  • Contact Info
  • Do Not Sell Data
  • GDPR Policy
  • Media Kits

Services

  • Subscriptions
  • Customer Support
  • Bulk Packages
  • Newsletters
  • Sponsored News
  • Work With Us

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

© Copyright Global News Bulletin.
  • Privacy Policy
  • Terms
  • Accessibility
  • Website Developed by Plenary Media Solution

Type above and press Enter to search. Press Esc to cancel.