Close Menu
  • Home
  • Education
  • Health
  • National News
  • Politics
  • Relationship & Wellness
  • World News
What's Hot

HBO vs Invisible Pirates: Delhi High Court blocks 30 websites illegally streaming content

July 29, 2026

'Not getting into back-and-forth': Mamdani shrugs off Netanyahu's 'hate' charge as Israeli PM heads to White House

July 29, 2026

Parliament debates examination Bill: How it compares with states’ anti-cheating laws

July 29, 2026
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram YouTube
Global News Bulletin
SUBSCRIBE
  • Home
  • Education
  • Health
  • National News
  • Politics
  • Relationship & Wellness
  • World News
Global News Bulletin
Home»Business»Artemis II crew's 10-day trip around Earth and Moon — timeline of Nasa’s historic lunar mission – The Times of India
Business

Artemis II crew's 10-day trip around Earth and Moon — timeline of Nasa’s historic lunar mission – The Times of India

editorialBy editorialApril 11, 2026No Comments3 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email Telegram Copy Link
Artemis II crew's 10-day trip around Earth and Moon — timeline of Nasa’s historic lunar mission – The Times of India
Share
Facebook Twitter LinkedIn Pinterest Email Copy Link
Artemis II crew's 10-day trip around Earth and Moon — timeline of Nasa’s historic lunar mission

Artemis II crew’s 10-day trip around Earth and Moon — timeline of Nasa’s historic lunar mission

Nasa’s Artemis II mission ended with a precise splashdown in the Pacific Ocean, capping a nearly 10-day journey that took four astronauts farther from Earth than any humans before. The Orion capsule “Integrity” parachuted into calm waters off California, with all crew members confirmed safe.Travelling a total of 694,392 miles (over 1.1 million km), the mission marked humanity’s first crewed voyage to the Moon’s vicinity since the Apollo era and a critical step toward future lunar landings.

Watch

Trump’s Call With Artemis II Crew Goes Silent For A Full Minute, Awkward Moment Goes Viral

Here is a timeline of the Artemis II mission:

Artemis II mission

April 1-2: Launch, orbit and critical system validation

The mission lifted off on April 1 from Kennedy Space Center aboard Nasa’s Space Launch System. After separation, Orion entered Earth orbit, where astronauts conducted extensive checks on life-support systems, propulsion, avionics, and solar arrays.This phase acted as a “shakedown cruise,” ensuring the spacecraft could safely support human life before committing to deep space travel. Engineers also verified the launch abort system and onboard batteries, which are crucial for emergency scenarios.

April 2-5: Translunar injection and deep-space transit

On April 2, Orion performed a powerful translunar injection burn, accelerating to nearly 22,000 mph and setting course for the Moon. Over the next three days, the crew travelled roughly 240,000 miles, crossing the Van Allen radiation belts and entering deep space.Astronauts monitored navigation systems, radiation shielding, and spacecraft autonomy while conducting experiments on the effects of microgravity. The spacecraft operated largely on automated systems, with minimal manual intervention required.

April 5-6: Closest approach and record-breaking lunar flyby

Around April 5, Artemis II reached the Moon, executing a close flyby that brought it within a few thousand miles of the lunar surface. The crew captured high-resolution images and studied the Moon’s terrain, including regions targeted for future missions.Using the Moon’s gravity, Orion performed a slingshot manoeuvre to begin its return journey. During this phase, the mission set a new record, travelling 252,756 miles from Earth—surpassing the Apollo 13 record.The flyby also marked a historic milestone, with the crew including the first woman, first Black astronaut, and first non-American to participate in a lunar mission.

April 6-10: Return journey and re-entry preparations

The return leg lasted another three to four days, during which the crew carried out final system checks and scientific observations. Engineers closely monitored the spacecraft’s heat shield performance data in preparation for re-entry, considered the most dangerous phase of the mission.Orion’s trajectory was carefully adjusted to reduce heat stress, following lessons learned from the Artemis I test flight.

April 11: High-risk re-entry and ‘perfect bull’s-eye’ splashdown

On April 11, Orion re-entered Earth’s atmosphere at speeds of up to 32 times the speed of sound. Temperatures reached nearly 5,000°F as the capsule endured intense friction, briefly losing communication for over six minutes due to ionised plasma, reported Reuters.Contact was restored moments before parachutes deployed, slowing the capsule to about 25 km/h before a precise splashdown. Nasa commentators described it as a “perfect bull’s-eye splashdown.”Recovery teams from Nasa and the US Navy secured the capsule within two hours. Astronauts were lifted via helicopter to the USS John P Murtha for medical checks before their return to Houston.

Poll

Which technological advancement from Artemis II are you most excited about?

The mission’s success validates key technologies needed for future Artemis missions, including a planned crewed Moon landing, and strengthens Nasa’s broader goal of sending humans to Mars.

Follow on Google News Follow on Flipboard
Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous Article10 Indian nationals indicted in US for visa fraud conspiracy
Next Article Artemis II splashes down: How the Moon mission heralds new era in human space travel
editorial
  • Website

Related Posts

'Not getting into back-and-forth': Mamdani shrugs off Netanyahu's 'hate' charge as Israeli PM heads to White House

July 29, 2026

After creating history for India and amid a gap year before college, what is next for Anahat Singh?

July 28, 2026

'Six major paper leaks in five years in Punjab': Swati Maliwal's 'super CM' swipe at Kejriwal

July 28, 2026

A400M vs C-130J vs C-390: India’s hunt for a new military transport aircraft enters next stage | – The Times of India

July 28, 2026

Red alert issued in Delhi as heavy rain lashes NCR, waterlogging in several areas

July 28, 2026

July 20 NEET protest: SC asks states to release student protesters under 18 with no criminal records

July 28, 2026
Add A Comment
Leave A Reply Cancel Reply

Economy News

HBO vs Invisible Pirates: Delhi High Court blocks 30 websites illegally streaming content

By editorialJuly 29, 2026

3 min readNew DelhiUpdated: Jul 28, 2026 03:36 PM IST Setting clear limits on the…

'Not getting into back-and-forth': Mamdani shrugs off Netanyahu's 'hate' charge as Israeli PM heads to White House

July 29, 2026

Parliament debates examination Bill: How it compares with states’ anti-cheating laws

July 29, 2026
Top Trending

HBO vs Invisible Pirates: Delhi High Court blocks 30 websites illegally streaming content

By editorialJuly 29, 2026

3 min readNew DelhiUpdated: Jul 28, 2026 03:36 PM IST Setting clear…

'Not getting into back-and-forth': Mamdani shrugs off Netanyahu's 'hate' charge as Israeli PM heads to White House

By editorialJuly 29, 2026

New York City Mayor Zohran Mamdani on Monday dismissed Benjamin Netanyahu’s accusation…

Parliament debates examination Bill: How it compares with states’ anti-cheating laws

By editorialJuly 29, 2026

The Centre tabled The Public Examinations (Prevention of Unfair Means) Amendment Bill…

Subscribe to News

Get the latest sports news from NewsSite about world, sports and politics.

Facebook X (Twitter) Instagram YouTube

News

  • Education
  • Health
  • National News
  • Relationship & Wellness
  • World News
  • Politics

Company

  • Information
  • Advertising
  • Classified Ads
  • Contact Info
  • Do Not Sell Data
  • GDPR Policy
  • Media Kits

Services

  • Subscriptions
  • Customer Support
  • Bulk Packages
  • Newsletters
  • Sponsored News
  • Work With Us

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

© Copyright Global News Bulletin.
  • Privacy Policy
  • Terms
  • Accessibility
  • Website Developed by Plenary Media Solution

Type above and press Enter to search. Press Esc to cancel.