Close Menu
  • Home
  • Education
  • Health
  • National News
  • Politics
  • Relationship & Wellness
  • World News
What's Hot

IPL 2026: Vaibhav Sooryavanshi dismissed for 8 as RR’s top order falls apart vs LSG | Cricket News – The Times of India

April 23, 2026

LSG vs RR IPL 2026 Highlights: Royals beat listless Lucknow by 40 runs

April 23, 2026

'Mamata's Tolabazi has digital address': Amit Malviya jibes CM with 'PAY2TMC' post on corruption allegations | India News – The Times of India

April 23, 2026
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram YouTube
Global News Bulletin
SUBSCRIBE
  • Home
  • Education
  • Health
  • National News
  • Politics
  • Relationship & Wellness
  • World News
Global News Bulletin
Home»National News»Golf View Condos safe, residents caused issues they face: DDA’s report to RERA on grievances
National News

Golf View Condos safe, residents caused issues they face: DDA’s report to RERA on grievances

editorialBy editorialOctober 20, 2025No Comments4 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email Telegram Copy Link
Golf View Condos safe, residents caused issues they face: DDA’s report to RERA on grievances
Share
Facebook Twitter LinkedIn Pinterest Email Copy Link

Even as residents of Golf View Condos, a luxury housing society in Dwarka’s Sector 19B, reported multiple construction-related issues to the Real Estate Regulatory Authority (RERA) in the past, a recent report by the Delhi Development Authority (DDA) has stated that the society is structurally safe and “constructed as per tender specifications”. The report, which the developer has submitted to the RERA, also claims that the residents are responsible for the issues raised by them.

DDA’s first venture into luxury housing, the Gold View Condos boasts of 11 towers housing 1,130 luxury flats — 14 penthouses, 170 Super High-Income Group (HIG) flats and 946 HIG flats, overlooking DDA’s newly constructed 18-hole golf course. The developer earlier said that the highest bid during the auctions for HIG flats went up to Rs 3 crore, for Super-HIG flats up to Rs 4.5 crore and for penthouses up to Rs 5.76 crore.

The Indian Express previously reported that residents had complained of substandard construction, including rusted iron fittings and seepage. There was also an alleged delay in the allocation of the flats, they said. While the DDA had promised the completion by June 2024, the flats were delivered by October 2024, they claimed.

Story continues below this ad

While hearing complaints of 11 such residents, Anand Kumar, Chairman and Ajay Kumar Kuhar, Member, RERA for the National Capital Territory (NCT) of Delhi, on August 20 directed DDA’s Vice Chairman to “ensure that the construction indeed has been carried out by the contractor as per the specifications given in the tender”. RERA had also pulled up DDA for the construction-related grievances, stating that it was “really concerned about the quality of work”. Even as DDA claimed that issues raised by the residents were resolved and photos and videos were submitted, the regulator said that it is “of the opinion that several issues still remain to be addressed as far as construction quality is concerned”.

In a report dated October 8, DDA stated that the masonry work, plastering and flooring as well as installation of doors, windows, fixtures, piping, wiring and fittings have all been carried out as per tender specifications.

The contractor of the project, Simplex Infrastructure Limited, “has been directed to address the rectification required at different locations as and where basis which are already minor in nature. Compliance will be ensured before final handover to the RWA,” DDA said.

Recurring water leakages, sewer blockages, lift breakdowns, and the dumping of construction debris have emerged as the most frequent complaints raised by residents. The DDA report blames the residents for these issues.

Story continues below this ad

The DDA said that the water supply line leakages were mainly caused by vibrations from interior renovation works carried out by allottees, which disturbed the joints of existing composite pipes. To ensure uninterrupted supply, the agency has begun replacing these pipes with CPVC (chlorinated polyvinyl chloride) lines that it claims offer better joint strength and vibration resistance.

On sewer line blockages, the report said that frequent clogs were found in horizontal waste lines and vertical stacks, not due to design or material defects, but instead caused by improper disposal of construction waste into drains and toilets. The DDA said it has deployed plumbers for immediate rectification and enforced penalties for violations. Regarding lift operation issues, the developer claimed that breakdowns and door malfunctions were not due to design defects but resulted from overloading and spillage of debris during renovation.

Allottees often transported dismantled tiles and sand through passenger lifts, exceeding weight limits and damaging sensors, the report said.

The DDA has now restricted the use of lifts for construction materials and appointed a dedicated maintenance agency for quick repairs.
Of the 1,130 flats, possession has been offered by the DDA for 1,074 flats so far and 1003 flats have been handed over to allottees. Around 400 families are currently living in the complex.

Follow on Google News Follow on Flipboard
Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleChina’s Q3 GDP growth slows to lowest in a year; Trump tariffs, trade tensions hit demand — Key points – The Times of India
Next Article Smriti Mandhana’s emotional confession after India’s World Cup heartbreak – 'I will take it on me' | Cricket News – The Times of India
editorial
  • Website

Related Posts

LSG vs RR IPL 2026 Highlights: Royals beat listless Lucknow by 40 runs

April 23, 2026

Ternus’ major test as Apple CEO: bringing product-first thinking back to the company

April 23, 2026

Two decades, three probes, no accused: How the 2006 Malegaon blasts case hit a wall

April 22, 2026

‘She strongly believes in minimalism’: Trisha Krishnan’s makeup artist of 19 years, Umesh Pawar, reveals her beauty secrets

April 22, 2026

UPMSP UP Board Class 10th 12th Result 2026 LIVE Updates: Board will announce the results during a press conference

April 22, 2026

UP Board Class 10th, 12th Result 2026 Date, Time: UPMSP to announce results on April 23

April 22, 2026
Add A Comment
Leave A Reply Cancel Reply

Economy News

IPL 2026: Vaibhav Sooryavanshi dismissed for 8 as RR’s top order falls apart vs LSG | Cricket News – The Times of India

By editorialApril 23, 2026

Rajasthan Royals’ Vaibhav Sooryavanshi (ANI Photo) The spotlight was firmly on Vaibhav Sooryavanshi heading into…

LSG vs RR IPL 2026 Highlights: Royals beat listless Lucknow by 40 runs

April 23, 2026

'Mamata's Tolabazi has digital address': Amit Malviya jibes CM with 'PAY2TMC' post on corruption allegations | India News – The Times of India

April 23, 2026
Top Trending

IPL 2026: Vaibhav Sooryavanshi dismissed for 8 as RR’s top order falls apart vs LSG | Cricket News – The Times of India

By editorialApril 23, 2026

Rajasthan Royals’ Vaibhav Sooryavanshi (ANI Photo) The spotlight was firmly on Vaibhav…

LSG vs RR IPL 2026 Highlights: Royals beat listless Lucknow by 40 runs

By editorialApril 23, 2026

LSG vs RR IPL 2026 Highlights: (BCCI/Creimas Photo)LSG vs RR IPL 2026…

'Mamata's Tolabazi has digital address': Amit Malviya jibes CM with 'PAY2TMC' post on corruption allegations | India News – The Times of India

By editorialApril 23, 2026

NEW DELHI: BJP’s IT cell chief Amit Malviya on Wednesday launched a…

Subscribe to News

Get the latest sports news from NewsSite about world, sports and politics.

Facebook X (Twitter) Instagram YouTube

News

  • Education
  • Health
  • National News
  • Relationship & Wellness
  • World News
  • Politics

Company

  • Information
  • Advertising
  • Classified Ads
  • Contact Info
  • Do Not Sell Data
  • GDPR Policy
  • Media Kits

Services

  • Subscriptions
  • Customer Support
  • Bulk Packages
  • Newsletters
  • Sponsored News
  • Work With Us

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

© Copyright Global News Bulletin.
  • Privacy Policy
  • Terms
  • Accessibility
  • Website Developed by Plenary Media Solution

Type above and press Enter to search. Press Esc to cancel.