Close Menu
  • Home
  • Education
  • Health
  • National News
  • Politics
  • Relationship & Wellness
  • World News
What's Hot

Horoscope Today: Daily astrological predictions for July 8, 2026

July 7, 2026

Knowledge Nugget: How direct seeded rice could be the future of rice farming

July 7, 2026

After all the drama… Balogun's controversial FIFA reprieve ends in World Cup heartbreak with little impact

July 7, 2026
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram YouTube
Global News Bulletin
SUBSCRIBE
  • Home
  • Education
  • Health
  • National News
  • Politics
  • Relationship & Wellness
  • World News
Global News Bulletin
Home»National News»Rs 7,000-crore Mumbai-Pune Expressway section crumbled in just 9 weeks
National News

Rs 7,000-crore Mumbai-Pune Expressway section crumbled in just 9 weeks

editorialBy editorialJuly 7, 2026No Comments5 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email Telegram Copy Link
Rs 7,000-crore Mumbai-Pune Expressway section crumbled in just 9 weeks
Share
Facebook Twitter LinkedIn Pinterest Email Copy Link

Barely nine weeks after Chief Minister Devendra Fadnavis inaugurated the Rs 6,695-crore Mumbai-Pune Expressway Missing Link as a permanent solution to the expressway’s worst traffic bottleneck, a monsoon-triggered landslide has partially shut the corridor, forcing traffic back onto the old Mumbai-Pune Highway it was built to bypass.

The disruption marks the first major monsoon test for one of Maharashtra’s most ambitious infrastructure projects, raising questions about the structural readiness of a corridor that was projected as a safer, faster and more reliable alternative to the accident-prone Khandala ghat section.

The Missing Link is a 13.3-km stretch built to bypass the 19.8-km Khandala ghat section between Khopoli and Sinhgad Institute. For years, traffic on the Mumbai–Pune Expressway was forced to converge on this six-lane stretch, negotiating steep gradients, hairpin bends and sharp curves that frequently witnessed crippling traffic jams and accidents.

The new alignment shortened the journey by nearly 6 km, reducing travel time between Mumbai and Pune by 20 to 30 minutes, with a speed limit of up to 100 kmph.

Why was it considered an engineering marvel?
Spread across 13.3 km, the Missing Link comprises two twin tunnels measuring 1.6 km and 8.9 km, two high-speed viaducts and a 183-metre cable-stayed bridge soaring above Tiger Valley, making it the tallest bridge of its kind in the country.

missing link Commuters walk along waterlogged railway tracks in Virar amid heavy monsoon rains that disrupted suburban train services across Mumbai. (Express Photo by Akash Patil)

The 8.9-km main tunnel, excavated nearly 180 metres below Lonavala Lake using the New Austrian Tunnelling Method, is among the widest road tunnels in the world. Engineers also had to construct temporary access passages through the Sahyadri hills. Designed to withstand the region’s high winds, dense fog, and intense monsoon rainfall, the project took nearly three decades to materialise.

Why did it take so long?
The need for an alternative to the accident-prone ghat section was first identified by RITES in 1995, even before the Mumbai-Pune Expressway was built.

Story continues below this ad

The Maharashtra Cabinet approved the project in 2017, construction began in 2019 and was subsequently delayed by the Covid-19 pandemic, difficult geological conditions and the engineering challenges of tunnelling through the Western Ghats.

At its inauguration on May 1, Fadnavis described the Missing Link as Maharashtra’s new “connecting link”, while the Maharashtra State Road Development Corporation (MSRDC) projected it as a permanent solution to congestion and accidents on the ghat section. MSRDC Managing Director Anilkumar Gaikwad had said the project would make travel between Mumbai and Pune “quicker and more reliable” by eliminating one of the busiest chokepoints on the expressway.

What happened on Monday?
The Missing Link suffered its first major disruption barely nine weeks after it was opened to traffic, after a landslide and damage to a retaining wall forced authorities to suspend vehicular movement through the stretch. The landslide resulted in a heavy flow of water on the Pune-to-Mumbai carriageway.

According to the State Highway Police, the incident occurred in the early hours of Monday following continuous heavy rainfall. Officials said a landslide took place near the end of the first tunnel on the Pune-to-Mumbai carriageway of the Missing Link, damaging a retaining wall and rendering the route unsafe for traffic.

Story continues below this ad

The Pune-to-Mumbai carriageway was immediately closed. Authorities initially suspended traffic in both directions, but around 10 am reopened the Mumbai-to-Pune carriageway while the Pune-to-Mumbai corridor remained shut. Since both the Missing Link and the adjoining flyover remained closed for Mumbai-bound traffic, vehicles travelling from Pune were diverted through the old Mumbai-Pune Highway (NH-48), with traffic being restored in phases.

missing link A waterlogged stretch on Narangi Bypass Road in Virar West following heavy monsoon rains (Express photos by Akash Patil)

The disruption came at a time when the old Pune-Mumbai Highway was also shut after a tree collapsed onto a power line, while heavy rainfall led to water accumulation at several locations. With both routes affected simultaneously, authorities appealed to motorists to postpone travel between Pune and Mumbai and follow official traffic advisories.

The closure comes barely nine weeks after the project’s inauguration, when it was showcased as the biggest upgrade to the region’s infrastructure since the country’s first access-controlled expressway opened in 2002.

Its closure after the landslide is the first major disruption on the corridor during the monsoon. It also underlines the challenge of building transport infrastructure through the Sahyadris, where heavy rainfall and unstable slopes continue to test even the state’s most ambitious engineering projects. Ironically, the road conceived to free motorists from monsoon disruptions on the old ghat section ended up sending them back to that very route within its first rainy season.

Story continues below this ad

What did the road authority say?

The Maharashtra State Road Development Corporation (MSRDC) has blamed the incident on nature, describing it as an “act of God”. The road authority also stressed that mitigation measures and designs were in place to counteract the landslides, but only to an extent. “This is not the contractor’s fault; it is nature at play,” said Anilkumar Gaikwad, vice chairman, MSRDC.

Gaikwad said that some boulders slid from the top due to relentless rain, blocking the mouth of tunnel 2. He said, “The tunnel structure has not been affected, but the false frame – which is an external structure built at the edges of tunnels – has been damaged.”

Another MSRDC official added that “rock fall mitigation measures are in place, vetted by IIT-Bombay. This includes rock boulting mesh up to a height of 15 meters on the mountain over the tunnel. That is still intact. But the boulders falling down are coming from a height of around 150m. Such heavy rainfall is akin to an act of God, with little that can be done to prevent it.”

Defending the work carried out on the project, the corporation said the tunnel had not suffered any structural damage.

Follow on Google News Follow on Flipboard
Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous Article'Bibi made rosy predictions': US miffed at Netanyahu for promises about Iran war that 'didn't come to pass'
Next Article 'Before warning signs become mass graves': UN chief sounds alarm over rising global conflicts
editorial
  • Website

Related Posts

Knowledge Nugget: How direct seeded rice could be the future of rice farming

July 7, 2026

Karnataka High Court lets murder accused register property from inside jail

July 7, 2026

Mumbai closes gender pay gap but fewer women are part of workforce

July 7, 2026

Court restores girl’s custody to mother, says child’s welfare outweighs ‘marital rape’ claim

July 7, 2026

Man faces engine issue in ‘almost’ brand new car, wins Rs 1 lakh, free replacement

July 7, 2026

‘Financial constraints no excuse’: Bombay HC calls delay in retirement dues ‘quite disturbing’, orders BEST to pay interest

July 7, 2026
Add A Comment
Leave A Reply Cancel Reply

Economy News

Horoscope Today: Daily astrological predictions for July 8, 2026

By editorialJuly 7, 2026

Horoscope Today: Read daily horoscope predictions for July 8, 2026. Know all about the astrological…

Knowledge Nugget: How direct seeded rice could be the future of rice farming

July 7, 2026

After all the drama… Balogun's controversial FIFA reprieve ends in World Cup heartbreak with little impact

July 7, 2026
Top Trending

Horoscope Today: Daily astrological predictions for July 8, 2026

By editorialJuly 7, 2026

Horoscope Today: Read daily horoscope predictions for July 8, 2026. Know all…

Knowledge Nugget: How direct seeded rice could be the future of rice farming

By editorialJuly 7, 2026

With sustainable agriculture, water conservation, and climate-resilient farming practices becoming crucial in…

After all the drama… Balogun's controversial FIFA reprieve ends in World Cup heartbreak with little impact

By editorialJuly 7, 2026

Folarin Balogun chases the ball during the World Cup round of 16…

Subscribe to News

Get the latest sports news from NewsSite about world, sports and politics.

Facebook X (Twitter) Instagram YouTube

News

  • Education
  • Health
  • National News
  • Relationship & Wellness
  • World News
  • Politics

Company

  • Information
  • Advertising
  • Classified Ads
  • Contact Info
  • Do Not Sell Data
  • GDPR Policy
  • Media Kits

Services

  • Subscriptions
  • Customer Support
  • Bulk Packages
  • Newsletters
  • Sponsored News
  • Work With Us

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

© Copyright Global News Bulletin.
  • Privacy Policy
  • Terms
  • Accessibility
  • Website Developed by Plenary Media Solution

Type above and press Enter to search. Press Esc to cancel.