Close Menu
  • Home
  • Education
  • Health
  • National News
  • Politics
  • Relationship & Wellness
  • World News
What's Hot

'Target Indians and Indians alone': New Zealand foreign minister Winston Peters alleges ‘covert’ immigration changes under FTA

June 28, 2026

RBI Grade B Prelims Result 2026 Out: Merit list PDF released at rbi.org.in

June 28, 2026

'Extreme religious fanaticism': Congress leader on NCERT removing 'secular' from textbook

June 28, 2026
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram YouTube
Global News Bulletin
SUBSCRIBE
  • Home
  • Education
  • Health
  • National News
  • Politics
  • Relationship & Wellness
  • World News
Global News Bulletin
Home»National News»Changing City: New Bhayandar-Gaimukh Link to ease Mumbai’s northern traffic
National News

Changing City: New Bhayandar-Gaimukh Link to ease Mumbai’s northern traffic

editorialBy editorialJune 28, 2026No Comments3 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email Telegram Copy Link
Changing City: New Bhayandar-Gaimukh Link to ease Mumbai’s northern traffic
Share
Facebook Twitter LinkedIn Pinterest Email Copy Link

Mumbai is dependent on a few corridors for vehicles to enter and leave the city. Two such corridors towards the northern end are the Ghodbunder Road and Vasai Creek Bridge, which lead to the Western Express Highway (WEH). To decongest these entry points, the Maharashtra Government on Monday approved an alternative corridor between Bhayandar and Gaimukh. To be built at Rs 17,000 crore, the partly elevated and partly underground corridor will be an alternative to the Ghodbunder Road and WEH.

The new stretch will serve as a quick connectivity point intunewith the rapid development of the Mumbai Metropolitan Region’s (MMR) suburbs.

Project overview

The Bhayandar-Gaimukh corridor is divided into two parts.

Thefirst, beginning from the Bhayandar end, is a creek bridge that will stretch 15 kilometres from Bhayandarto the Fountain Hotel Junction.The second leg of the journey, between the Fountain Hotel Junction and Gaimukh, continues via underground twin tunnels for around 6 km.

The six-lane corridor between Bhayandar and Gaimukh targets a seamless journey to and from Mumbai through the north.

Total length:15.44 km

Elevated Creek Bridge from Bhayandar to Fountain Hotel Junction: 9.58 km; 3+3 lanes

Underground Route from Fountain Hotel Junction to Gaimukh: 5.86 km; 3+3 twin tunnels

How it will help

The 16-km route between Bhayandar and Gaimukh is also one of the most congested entry points into Mumbai.

Story continues below this ad

Currently, the journey between Bhayandar and Gaimukh takes anywhere between 30 minutes at the minimum to over an hour with increasing traffic. Traffic on the Ghodbunder Road is an almost perpetual phenomenon, prolonging the journey between the two suburbs.

Through Ghodbunder Road, traffic enters from Thane, Kalyan, Dombivli, Bhiwandi and other eastern suburbs.

At the Hotel Fountain Junction, vehicles enter from Vasai, Virar,Palghar and other northern suburbs, as well asfrom Gujarat along the NH-48.

This long-distance traffic, as well as local traffic, causes the time taken to cover the short distance to stretch into hours. With the access-controlled corridor directly connecting Bhayandar and Gaimukh, there will be another alternative to the congested roads and a separation of local traffic. Hence, entering Mumbai through the city’s north will take just around 20 minutes.

Story continues below this ad

The Metro Line 10 is also coming up along this route, further reducing traffic.

Timeline:5 years

Cost:Rs 17,036.03 crore

Construction cost:Rs 12,947.40 crore

Private land needed:57.76 Hectares

Land acquisition costs:Rs 713.94 crore

Funding

To be built on a PPP basis

60% by private concessionaire

40% of the cost will be covered by Viability Gap Funding — half from the central government and half from the state government

Executing agency

Mumbai Metropolitan Region Development Authority (MMRDA)

MMRDA has also been appointed as Special Planning Authority (SPA) for theinfluence area of the project.The project is under the scrutiny of the Network Planning Group (NPG) under the PM Gati Shakti initiative.

Next step

Cost approvals from the central government and tenderingexercise.

Official speak

“Since the Mumbai North Coastal Road Project terminates near the Uttan Road Junction, and the majority of traffic enters Mumbai via the Ghodbunder Junction, connectivity between Bhayandar and Ghodbunder is required to establish an alternative route to the Western Express Highway. This proposed elevated road will distribute regional and local traffic more efficiently and improve the resilience of the road network,” says the Government Resolution approving the project.

Follow on Google News Follow on Flipboard
Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleXi's military purge widens: China strips six generals, ex-Politburo member of lawmaker posts
Next Article 'When is PM Mann Ki Baat on this?' Priyank Kharge on Ram Mandir funds row
editorial
  • Website

Related Posts

RBI Grade B Prelims Result 2026 Out: Merit list PDF released at rbi.org.in

June 28, 2026

‘It’s a privilege to be turning 30’: Tara Sutaria on taboo around the word ‘ageing’

June 28, 2026

Rain forecast in Delhi, Mumbai; red alert in Bengal as Monsoon pushes on amid El Niño

June 27, 2026

‘Black Friday’ vibes: Viral videos of France’s AC rush amid heatwave stuns Internet

June 27, 2026

Kriti Sanon chooses Deepika Padukone’s Veronica; but says Cocktail 2 ‘completely different’

June 27, 2026

Guru Randhawa gym firing: 2 arrested in ‘encounter’, Pakistan-made pistol seized

June 27, 2026
Add A Comment
Leave A Reply Cancel Reply

Economy News

'Target Indians and Indians alone': New Zealand foreign minister Winston Peters alleges ‘covert’ immigration changes under FTA

By editorialJune 28, 2026

New Zealand foreign minister and first leader Winston Peters has accused the National Party-led government…

RBI Grade B Prelims Result 2026 Out: Merit list PDF released at rbi.org.in

June 28, 2026

'Extreme religious fanaticism': Congress leader on NCERT removing 'secular' from textbook

June 28, 2026
Top Trending

'Target Indians and Indians alone': New Zealand foreign minister Winston Peters alleges ‘covert’ immigration changes under FTA

By editorialJune 28, 2026

New Zealand foreign minister and first leader Winston Peters has accused the…

RBI Grade B Prelims Result 2026 Out: Merit list PDF released at rbi.org.in

By editorialJune 28, 2026

2 min readNew DelhiJun 26, 2026 11:52 AM IST The Reserve Bank…

'Extreme religious fanaticism': Congress leader on NCERT removing 'secular' from textbook

By editorialJune 28, 2026

Congress leader, Vijay Wadettiwar, questions NCERT for removing ‘secular’ and ‘secularism’ NEW…

Subscribe to News

Get the latest sports news from NewsSite about world, sports and politics.

Facebook X (Twitter) Instagram YouTube

News

  • Education
  • Health
  • National News
  • Relationship & Wellness
  • World News
  • Politics

Company

  • Information
  • Advertising
  • Classified Ads
  • Contact Info
  • Do Not Sell Data
  • GDPR Policy
  • Media Kits

Services

  • Subscriptions
  • Customer Support
  • Bulk Packages
  • Newsletters
  • Sponsored News
  • Work With Us

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

© Copyright Global News Bulletin.
  • Privacy Policy
  • Terms
  • Accessibility
  • Website Developed by Plenary Media Solution

Type above and press Enter to search. Press Esc to cancel.